Jump to main content

Archaeology

Kowloon

Date of completion Title
Kowloon City
Remnants of Lung Tsun Stone Bridge
Aug 2009 Kai Tak Development Engineering Study cum Design and Construction of Advance Works- Investigation, Design and Construction
Further Archaeological Excavation Report [17.4 MB]
Nov 2009 Conservation Management Plan for the Site of Lung Tsun Stone Bridge [5.9 MB]
Dec 2012 A Research on Lung Tsun Stone Bridge and Its Surrounding Area (Chinese version only) [8.3 MB]
Aug 2013 Interpretation Principles and Guidelines for the Lung Tsun Stone Bridge Preservation Corridor [63 MB]
Sep 2013 Lung Tsun Stone Bridge Full Excavation Report [51.6 MB]
Sung Wong Toi
Dec 2012 Brief on the Archaeological Work at Sacred Hill (North) Study Area for Shatin to Central Link (SCL) – Tai Wai to Hung Hom Section [1.9 MB]
Mar 2013 Brief on the Cultural Remains of Song-Yuan Period Unearthed by Archaeological Work at Sacred Hill (North) Study Area for Shatin to Central Link (SCL) – Tai Wai to Hung Hom Section [3.6 MB]
Sep 2013 Brief on the Cultural Remains of Song-Yuan Period Unearthed by Archaeological Work at Sacred Hill (North) Study Area for Shatin to Central Link – Tai Wai to Hung Hom Section [3.3 MB]
Nov 2013 Brief on the Cultural Remains of Song-Yuan Period Unearthed by Archaeological Work at Sacred Hill (North) Study Area for Shatin to Central Link – Tai Wai to Hung Hom Section [2.9 MB]
Apr 2014 Brief on the Cultural Remains of Song-Yuan Period Discovered during Archaeological Watching Brief at the Launching Shaft Area of the Sung Wong Toi Station of Shatin to Central Link – Tai Wai to Hung Hom Section [1.9 MB]
Apr 2014 Interim Report on the Archaeological Survey cum Excavation Findings in Sacred Hill (North) for Shatin to Central Link (Tai Wai to Hung Hom Section) [12.8 MB]
May 2014 Brief on the Sheetpile Proposal for Retaining T1 Area at the Launching Shaft Area, of the To Kwa Wan Station of Shatin to Central Link – Tai Wai to Hung Hom Section [6.8 MB]
June 2017 Archaeological Excavation Report for Sacred Hill Area (Phases 1 to 3 Archaeological Works) for Shatin to Central Link - Tai Wai to Hung Hom Section (revised in June 2021) [391MB]
August 2020 Archaeological Report for Sacred Hill Area (Licence Nos. 409 and 424) for Shatin to Central Link (Tai Wai to Hung Hom Section) [14.1 MB]
Kai Tak
June 2016 Kai Tak Development - Infrastructure at Former Runway and Remaining Areas of North Apron and Improvement of Adjacent Waterways: Design and Construction
Phase 1 Archaeological Field Investigation Report [31.5MB]
Wong Tai Sin
Ngau Chi Wan
Oct 2014 Upgrading of Central and East Kowloon Sewerage – Phase 2 Archaeological Watching Brief Report [1MB]
Former Tai Hom Village
February 2017 Archaeological Survey-cum-Excavation Report for Former Tai Hom Village for Shatin to Central Link- Tai Wai to Hung Hom Section [42.9MB]
Nga Tsin Wai Village
August 2021 URA Project K1 Nga Tsin Wai Village redevelopment (NTW) - Report on Protective Works for Excavated Remains [6.5MB]
February 2023 Archaeological Investigation at Nga Tsin Wai Village - Archaeological Impact Assessment Report [396MB]
February 2023 Further Investigation at Nga Tsin Wai Village Report [477MB]
February 2023 Stage 1 - Further Investigation of Enclosure Wall in Nga Tsin Wai Village Report [54.6MB]
Yau Tsim Mong
Mong Kok
Sep 2014 Replacement and Rehabilitation of Water Mains, Stage 3, Mains in West Kowloon (Package A) Archaeological Watching Brief Report [3.5MB]
Top